Control and supervision of the construction works: Highway A-50. Section: Narros del Castillo - Peñaranda de Bracamonte. Section length: 14 km.
This highway section (14 km long) connects in the south with the AP-51 toll road and the A-6 North Western Highway and in the north with Highway A-62 (Castile Highway) and Highway A-66 (Ruta de la Plata) when passing through Salamanca. It will improve connections between the west and center of Spain. The typical highway cross-section is composed of two 7-m carriageways with two 3.50-m lanes each, 2.50-m outside shoulders and 1.00-m inside shoulders, with 1.00-m benches attached. The median strip is 10 m wide. The highway includes 18 structures, with a total construction budget of € 31,217,934.
The contract for the supervision of the construction works included: technical, administrative and financial management of the construction works; quality control; supervision of the Contractor’s implementation of the Quality Assurance Plan; laboratory testing; Bill of Quantities and financial control; health and safety coordination; monitoring of the environmental impact mitigation measures and technical assistance services for the design and supervision of addenda to the project.