Supervision of construction of the new double railway line, on a stretch of 135 km for connection of Oued Tlelat to Tlemcen, near Oran.
The works include the construction of a new railway line a length of about 135 km for connection of Oued Tlelat, near Oran and the “willaya” of Tlemcen. This new double railway line electrified and for speeds up to 220 km/h include:
- 3 Railway Stations;
- 129 Viaducts (14 km)
- 3 Tunnels (1,5 km)
- 16.334 T of tracks
- 96 switch points
- 23,214,090 m3 of earth works
- Electrification
- Signalling and telecommunications