The contract concerns the management and maintenance of technical installations in the “Boulevard Industriel 200” building at à 1070 Brussels (Anderlecht).
This contract has the objective of performing operational, management, monitoring, maintenance and repair services to the technical installations, notably:
- HVAC installations (heating, extraction and drive, ventilation);
- Electrical installations (HV stations, distribution boards, lighting);
- Lifts;
- Automatic doors;
- Sanitary facilities (water treatment, toilets, showers).