Design, implementation and commissioning of a welded parts production and erection shop to build insulated containers to transport goods at pre-defined temperatures and to build sinterized mechanical parts.
Turnkey project, comprising :
- Project studies
- Purchasing of the electromechanical equipment
- Conveying of the equipment to the erection site
- Equipment erection
- Commissioning and construction of model containers and sinterized parts