Work supervision and monitoring services
-
Rehabilitation of 410 ha of the Ndouloumadji agricultural land;
-
Development of 860 hectares of irrigated village perimeters (IVP);
-
Supply and installation of electrical and electromechanical equipment for all pumping stations;
-
Building of a water management structure in two (02) drainage basins for a total area of 720 ha on average per year;
-
Dredging of the mouth of the Diamel;
-
Construction of 68 km of trails allowing access to rehabilitated perimeters and preventing the isolation of Diéri villages operating in the Walo