image
TPF ENGINEERING
BRUSSELS NATIONAL AIRPORT

BRUSSELS NATIONAL AIRPORT

  • general data
  • Subtitel 1
    Construction of an ensemble of administrative and technical buildings
  • Project cost
    21.2Million €
  • Realization date
    from 2000until 2005Year(s)
  • Site
    Brussels – National
  • Client
    BELGOCONTROL (Mr Mawet – tél : 02/206.20.01)
  • Partners

    Architect: Michel JASPERS & Partners

  • Program Description
  • Program Description

    Belgocontrol has entrusted to the Association formed by the TPF Engineering research consultancies and the Michel Jaspers & Partners Architectural Practice the study of an ensemble of administrative and technical buildings o­n the land of Brussels National Airport.

    This complex comprises also a cafetaria, a training centre, housings and a building for the control organization CANAC thatmanages Belgian aerospace traffic.

  • Assignment
  • Assignment

    In this project, TPF Engineering has studied and has carried out the following technical procedures:

    • Technical and structural installations for buildings, infrastructures and surroundings.
    • Technical installations for buildings (Electricity, HVAC, Bathrooms/Toilets, Transport, Signals, Acoustics, Security, Safety, etc.).
    • Engineering studies relating to infrastructures (roads and various networks).
  • Images
  • Image 1
    image
TPF Annual Report 2008 (UK)
TPF Annual Report 2008 (FR)

 
powered by Red4Net®Copyright ©TPF Group